<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Greater Nashua Habitat for Humanity &#187; Volunteer Work</title>
	<atom:link href="http://www.nashuahabitat.org/tag/volunteer-work/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.nashuahabitat.org</link>
	<description>Building Houses - Building Lives</description>
	<lastBuildDate>Wed, 29 Jun 2011 14:40:21 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
		<item>
		<title>Build in Wilton – Thursday, November 4th and Saturday, November 6th</title>
		<link>http://www.nashuahabitat.org/2010/11/01/build-in-wilton-%e2%80%93-thursday-november-4th-and-saturday-november-6th/</link>
		<comments>http://www.nashuahabitat.org/2010/11/01/build-in-wilton-%e2%80%93-thursday-november-4th-and-saturday-november-6th/#comments</comments>
		<pubDate>Tue, 02 Nov 2010 03:08:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Builds]]></category>
		<category><![CDATA[Request for Materials]]></category>
		<category><![CDATA[Request for Volunteers]]></category>
		<category><![CDATA[Volunteer Position]]></category>
		<category><![CDATA[Building Committee]]></category>
		<category><![CDATA[Eric Moore]]></category>
		<category><![CDATA[New Hampshire]]></category>
		<category><![CDATA[Volunteer Work]]></category>
		<category><![CDATA[Wilton]]></category>

		<guid isPermaLink="false">http://www.nashuahabitat.org/?p=1827</guid>
		<description><![CDATA[We’ll continue with volunteer construction at our new home site on the corner of Russell and Maple Streets in Wilton. We’ll be indoors if the weather isn’t &#8211; as forecast for Thursday. Saturday’s long-range weather forecast looks favorable to mostly finish up outside. Thursday: Meet at Wilton construction site, corner of Russell and Maple Streets, [...]]]></description>
			<content:encoded><![CDATA[<div id="attachment_1828" class="wp-caption aligncenter" style="width: 586px"><a href="http://www.nashuahabitat.org/wp-content/uploads/2010/11/gnhfhwebsite.jpg"><img class="size-full wp-image-1828" title="gnhfhwebsite" src="http://www.nashuahabitat.org/wp-content/uploads/2010/11/gnhfhwebsite.jpg" alt="" width="576" height="386" /></a><p class="wp-caption-text">A volunteer at the Wilton, New Hampshire site. Photo courtesy of Jill Dionne.</p></div>
<p>We’ll continue with volunteer construction at our new home site on the corner of Russell and Maple Streets in Wilton. We’ll be indoors if the weather isn’t &#8211; as forecast for Thursday. Saturday’s long-range weather forecast looks favorable to mostly finish up outside.</p>
<p><strong>Thursday</strong>: Meet at Wilton construction site, corner of Russell and Maple Streets, Wilton. Please bring lunches.</p>
<p><strong>Saturday</strong>: Meet at Wilton construction site, corner of Russell and Maple Streets, Wilton. Please bring lunches. </p>
<p>Directions from NH-101A, heading WEST out of Nashua:<span id="more-1827"></span></p>
<p>Turn LEFT after NH-101 overpass to take the RT-101 W ramp toward PETERBOROUGH/KEENE, merging onto NH-101 (Milford bypass). 4.9 mi to -<br />
Turn LEFT onto ELM ST/NH-101. 0.8 mi to -<br />
Turn (bear) RIGHT onto WILTON RD. 0.5 mi to - <br />
WILTON RD becomes MAIN ST. 0.3 mi to -<br />
Turn RIGHT onto RUSSELL ST. 0.1 mi to -<br />
End at site on the RIGHT, corner RUSSELL ST &amp; MAPLE ST. </p>
<p>Volunteer work: Finish painting eaves and trim. Finish deck work. Support rough electrical / plumbing. </p>
<p>See as many of you as can make it, starting by 9.00AM. </p>
<p>Completed since last Saturday:</p>
<p>Russell Street, Wilton: Finished hanging soffits. 2nd coat paint on most of the exterior. Built benches for deck, continued most of deck railing. Trimmed basement windows. Poured concrete pad and completed stairs from side entrance. Photos posted to our Web-based Picasa album: <a href="http://picasaweb.google.com/nashabitat/RussellSt" target="_blank"></a><a href="http://picasaweb.google.com/">http://picasaweb.google.com</a>/nashabitat/RussellSt# .</p>
<p>Upcoming events:</p>
<p>Russell Street, Wilton: Continue construction. Still seeking donations / deals.<br />
Nashua Neighborhood Housing, 63 Temple St., Nashua: Repair ramp (probably spring 2011).<br />
Nashua Children’s Home, 125 Amherst St., Nashua: Replace ramp (probably spring 2011).<br />
Other small projects being coordinated.</p>
<p>If you have any questions, please call our Building Committee Chairman, Eric Moore, at 603.620.4182.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.nashuahabitat.org/2010/11/01/build-in-wilton-%e2%80%93-thursday-november-4th-and-saturday-november-6th/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Build &#8211; January 30</title>
		<link>http://www.nashuahabitat.org/2010/01/28/build-january-9/</link>
		<comments>http://www.nashuahabitat.org/2010/01/28/build-january-9/#comments</comments>
		<pubDate>Thu, 28 Jan 2010 07:22:19 +0000</pubDate>
		<dc:creator>ed</dc:creator>
				<category><![CDATA[Builds]]></category>
		<category><![CDATA[Request for Volunteers]]></category>
		<category><![CDATA[Building Committee]]></category>
		<category><![CDATA[Eric Moore]]></category>
		<category><![CDATA[Milford]]></category>
		<category><![CDATA[Volunteer Work]]></category>
		<category><![CDATA[Volunteerig]]></category>

		<guid isPermaLink="false">http://www.nashabitat.org/?p=1375</guid>
		<description><![CDATA[With snow on the ground, and decent weather expected for Saturday, we&#8217;ll continue burning the brush at our new duplex site on Tonella Road in Milford.  Free firewood!  Please bring chainsaws, etc. as available &#8211; can&#8217;t burn anything over 5-inches in diameter (but can remove anything suitable as firewood). Directions from NH-101 Overpass Over NH-101A (Nashua [...]]]></description>
			<content:encoded><![CDATA[<p>With snow on the ground, and decent weather expected for Saturday, we&#8217;ll continue burning the brush at our new duplex site on Tonella Road in Milford. </p>
<h1>Free firewood! </h1>
<h2>Please bring chainsaws, etc. as available &#8211; can&#8217;t burn anything over 5-inches in diameter (but can remove anything suitable as firewood).</h2>
<p>Directions from NH-101 Overpass Over NH-101A (Nashua Street, at the Amherst / Milford Line):</p>
<p>1. Continue west on NH-101A W / Nashua St. 1.5 miles to<br />
2. Left (just before County Store) onto TONELLA ROAD. 0.2 miles to<br />
3. Left to house site, on east side of the road&#8230;</p>
<p>We hope to see as many of you as can make it, starting about 9:00 AM.</p>
<h2>This is a big job; would appreciate good turnout. Between the work and the fire, it&#8217;ll be plenty warm&#8230;</h2>
]]></content:encoded>
			<wfw:commentRss>http://www.nashuahabitat.org/2010/01/28/build-january-9/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

