Build – April 25
This Saturday, we will continue putting up a handicapped access ramp for SHARE Outreach in Milford – install posts on the concrete piers, hang platforms and ramps, deck the remaining areas, and install railings plus steps at the end.
Directions from the Milford oval – 0.5 mi west on Elm Street to left on Columbus Ave – SHARE sign out front, between Robbins Auto and Harvey’s Music. The cinder block SHARE building is at the end; ramp will go at the back (south) side.
See as many of you as can make it, starting around 9:00 AM.
Completed since last Saturday:
- (SHARE, Columbus Ave., Milford) Framed both platforms, plus one ramp, installed the upper platform and decked it. Dug post holes and poured concrete piers for all posts.
Upcoming events:
- Building permit and temporary power, 7-1/2 Ridge Street, Nashua
- Fence for autistic boy, Nashua (subject to weather)
- Siding, fence, and deck repairs, 63 Tolles Street, Nashua (subject to weather, deferred work from December / January)
- Other small projects being coordinated
eric
Cell: 620-4182
Tags: Milford, Volunteering