Build – November 8
This Saturday, we’ll start installation of laminate flooring to remove a mold hazard for an autistic child. He’s doing better now than at the end of last week; regret last-minute delay from last Saturday. This will be indoor work, starting by pulling the existing baseboard, then placing a vapor barrier before laying the floor. The family has already removed the old carpet and tack strip. Materials will be delivered mid-week to start acclimating.
Directions to Apt 4, 3 Louisburg Square, in south Nashua: the Louisburg Square complex is a west entrance off Daniel Webster Highway, about 500 yds south of Everett Turnpike Exit 2 and 200 yds north of the shopping plazas at Spit Brook Road (Everett Turnpike Exit 1). Turn left on entering the Louisburg Square complex; Unit 3 will be at the end of the parking area on the right-hand side. Apt #4 is on the ground floor (basement) at the back (north) side of Unit 3.
See as many of you as can make it, starting around 9:00 AM.
Upcoming events:
- Stay Warm NH weatherization project, tentatively 15 November
- 7-1/2 Ridge Street zoning variance hearing, continued to ~25 November
- Building permit, 7-1/2 Ridge Street
- Connect temporary power (7-1/2 Ridge Street, Nashua)
- Other small projects being coordinated
eric
Cell: 620-4182
Tags: Volunteering