Build – November 1 – Postponed
UPDATE: Construction is cancelled for Saturday November 1st, due to hospitalization in client’s family. Should be able to start flooring on Saturday 8th. Regret short notice.
Meanwhile, the family has already removed most of the carpeting and tack strip, which will speed up the work when resumed.
Thanks for bearing with us.
eric
This Saturday, we’ll start installation of laminate flooring to remove a mold hazard for an autistic child. This will be indoor work, starting by removing the existing carpeting, then placing vapor barrier before laying the floor.
Directions to Apt 4, 3 Louisburg Square, in south Nashua: the Louisburg Square complex is a west entrance off Daniel Webster Highway, about 500 yds south of Everett Turnpike Exit 2 and 200 yds north of the shopping plazas at Spit Brook Road (Everett Turnpike Exit 1). 3 Louisburg Square is to the left, on the right side. Apt #4 is on the back side of Unit 3.
See as many of you as can make it, starting around 9:00 AM.
Upcoming events:
- 7-1/2 Ridge Street zoning variance hearing, continued to ~25 November
- Building permit, 7-1/2 Ridge Street
- Connect temporary power (7-1/2 Ridge Street, Nashua)
- Other small projects being coordinated
eric
Cell: 620-4182
Tags: Volunteering