Build – November 1 – Postponed
Thursday, October 30th, 2008UPDATE: Construction is cancelled for Saturday November 1st, due to hospitalization in client’s family. Should be able to start flooring on Saturday 8th. Regret short notice.
Meanwhile, the family has already removed most of the carpeting and tack strip, which will speed up the work when resumed.
Thanks for bearing with us.
eric
This Saturday, we’ll start installation of laminate flooring to remove a mold hazard for an autistic child. This will be indoor work, starting by removing the existing carpeting, then placing vapor barrier before laying the floor.